48-HR JOB SITE DEPLOYMENT
NO FULL-TIME SALARY • NO BENEFITS • 30 DAYS' NOTICE

Project Operations & Owner's Representation — Without the Payroll Overhead.

You have the crew and the subs. What you don't have is a full week to chase trades, answer client calls, and reconcile invoices while bidding next month's work.

Pick only the pieces you want covered. No software for you to learn. We step onto your active job site within 48 hours and adapt directly to your trade workflow.

RAPID ONBOARDING

We step onto your active job site within 48 hours, adapt to your workflow, and manage subs directly.

ZERO-FRICTION

No software for you to learn. We plug straight into your existing communication and trade channels.

MARGIN PROTECTION

Recapture 15+ hours/week to bid and win new work while protecting your job profit margins.

No obligation — 20-min call No long-term contract Reply within 24 hours
Construction Operations Project Manager overseeing job site
Katelyn Bethmann headshot
Katelyn BethmannMBA

Lean Six Sigma Black Belt • Operations & Trade Logistics Specialist

UT Haslam Supply Chain Management

48-Hour
Job site deployment
15+ hrs/wk
Recaptured to bid new work
30-Day Notice
No long-term contract
MBA + Black Belt
Supply chain rigor
!

The Margin Math: One missed inspection or a two-week trade gap on a $1.5M build costs you more than a full month of dedicated project management.

Calculate Your Job ROI →
THREE FLEXIBLE SERVICE STRUCTURES

Modular Trade Coverage Tailored To Your Job Site

Choose an a la carte menu to patch specific trade gaps, lock in full-project oversight, or choose a 3% flat fee tied directly to your contract value.

OPTION A30 Days' Notice

A La Carte Menu

Check the boxes you want covered. Add or drop any line item with 30 days’ notice.

1

Scope of Work (SOW) & Bid Audit Package

$2,500 one-time fee / per bid

Full plan & scope-gap review before contract signing. Normalizes sub bids to apples-to-apples. Includes written SOW, exclusions list, and line-item budget with contingency.

Fee credited toward Option B if you move forward with Full-Project PM.
2

Critical Path Scheduling & Subcontractor Coordination

$3,500 per month / per active job

Master Gantt chart built on true critical path. 48-hour trade dispatch reminders, weekly coordination calls, same-day re-sequencing when weather or supply delays hit.

Your subs, your relationships — we coordinate, we never contract them.
3

Client & Permit Liaison (Owner Representative)

$2,500 per month / per active job

Weekly photo progress reports. Material selection & lead-time tracking. Inspector and municipal scheduling handled. Change orders documented, priced, and approved before work begins.

Every client conversation logged and copied to you. No surprises.
4

Job Costing & Budget Control

$1,800 per month / per active job

Real-time actuals vs. budget tracked weekly by line item. Sub draw requests verified against completed work on site. Change-order billing issued the same week.

Unbilled change orders are the #1 silent margin leak. This closes it.
BEST VALUE
OPTION B

Full-Project PM

All four services, end-to-end management

$6,000per month / per active job
SOW & Bid Audit included FREE at kickoff ($2,500 value)

Hand off the whole job. I own the schedule, the subs, the client, the permits, and the budget from pre-con to punch list. You stay on estimating and business growth.

  • End-to-end critical path master schedule
  • Weekly client photo progress reports & material lead times
  • Live job costing, weekly draw audits, same-week change orders
  • Municipal building inspections & permit closeouts
Select Full-Project PM Coverage
OPTION C

3% Flat Fee on Total Contract Value

Ideal for larger custom residential or complex commercial builds

For larger or complex builds, one fixed fee is cleaner than a monthly line item. Full scope of Option B, structured at 3% of total contract value.

Zero Extra For Schedule Slips:

Tied to job size rather than duration — so an unavoidable weather or material schedule slip costs you zero extra in management fees.

Terms: $3,000 deposit at signing; remainder divided into milestone draws aligned with your project draw schedule.
Inquire About 3% Flat Structure
Interactive Cost & Margin Engine

Compare Project Management Coverage Models

"The margin math: one missed inspection or a two-week trade gap on a $1.5M job costs you more than a full month of management."

$250K$1.5M (Typical)$3M$5M+
2 Months6–8 Months12 Months18 Months

Configure A La Carte Line Items:

Option AModular
A La Carte Total
$57,100

Based on your 7-month schedule and selected line items. Add or drop any line item with 30 days’ notice.

Deposit: 50% down on selected items
Best Value Recommended
Option BAll 4 End-to-End
Full-Project PM
$42,000

$6,000/month for full end-to-end management. SOW & Bid Audit ($2,500 value) included FREE at kickoff.

Saves $15,100 vs separate a la carteRetainer: $1,800 (credited to 1st draw)
Option CTied to Contract
3% Flat Contract Fee
$45,000

Full scope of Option B, structured at 3% of total contract. Schedule slips cost you zero extra in management fees.

Deposit: $3,000 at signing, remainder in milestone draws

Estimated Margin Protected on this Build:

~$67,500 protected from trade idle gaps & unbilled change orders

Lock In 48-Hr Kickoff
LIVE CRITICAL-PATH ENGINE

See the 48-Hour Re-Sequence In Action

Trigger a trade delay and watch the critical path re-dispatch downstream subs in real time — the exact operational response you get on day one of Full-Project PM coverage.

LIVE CRITICAL-PATH ENGINE

48-Hour Trade Re-Sequencing Simulator

This is exactly what happens on your job site when a trade slips. Trigger a delay and watch the critical path re-dispatch downstream subs within 48 hours — no spreadsheet, no missed calls, no idle crew billing.

Project Length
34 days
Inject a delay:

Baseline schedule: 8 trades on the critical path across a 34-day build. Trigger any delay above to watch the live re-sequencing engine respond.

D1
D8
D15
D22
D29
D34
Excavation
Earthwork Crew
3d
Foundation
Concrete Sub
4d
Framing
Framing Crew
7d
Plumbing
Plumbing Sub
4d+7f
Electrical
Electrician
4d
HVAC
Mechanical Sub
3d+1f
Drywall
Drywall Crew
6d
Paint
Finish Crew
4d
Finishes
Millwork Sub
5d
Walkthrough
PM / Owner
1d
Critical Path Float / Parallel Trade Delayed TradeOriginal Position+NdDays Shifted

Critical-Path Propagation

A delay on a critical trade instantly pushes every dependent sub downstream — modeled here in real time.

Float Absorption

Parallel trades with schedule float absorb slip where possible, minimizing net project extension.

48-Hour Re-Dispatch

Same-day re-sequencing with 48-hour trade dispatch reminders — no idle crew, no unbilled change orders.

Stop bleeding margin on trade gaps this week.

Book a free 20-minute scope review. We'll audit your active schedule and show you exactly where hours and margin are leaking — no obligation.

Book My Free Review
TRANSPARENT TIMELINE

How Billing & Onboarding Works

Step-by-step from written scope to active job site coordination and closeout binder.

01

Agreement Signed

Clear scope and fees in writing. No surprise invoices, ever. 30 days’ notice on all monthly plans.

02

Deposit

$1,800 activation retainer (Full PM, credited to your first draw). $3,000 deposit (3% Flat Fee). 50% down (a la carte).

03

48-Hour Kickoff

We step on-site immediately. Full PM bills $3,000 on the 1st and the 15th through bi-weekly draws aligned with trade velocity.

04

Closeout Binder

Final balance released at punch-list signoff, delivered with complete owner closeout binder and final margin audit report.

Katelyn Bethmann, MBA
Katelyn Bethmann, MBA
Lean Six Sigma Black Belt
Operations & Trade Logistics Specialist
LEADERSHIP PROFILE

Rigorous Industrial Logistics Applied Directly to Job Site Operations

Construction trade coordination fails because traditional management treats schedules as static spreadsheets rather than live, volatile logistics chains. With an MBA in Supply Chain Management from the UT Haslam College of Business and a Lean Six Sigma Black Belt, Katelyn applies root-cause variance control, bottleneck elimination, and rapid trade re-sequencing to keep projects moving.

You Remain GC of Record

You hold the license, keep the relationships with your trades, and collect the contract revenue. We coordinate and execute the daily operational heavy lifting.

Zero Software Overhead

No new apps for you or your subcontractors to download. We meet your subs on phone, SMS, and job site visits where they already communicate.

Book Your Free Scope Review

Tell us about your active build. No long-term contract. 30 days' notice. You keep your GC license & trade relationships.

Zero Payroll Overhead: You remain the General Contractor of record. We coordinate trades and protect your job margin with 30 days’ notice.

Direct telephone dispatch: 865-591-2488 • Email: kb@buildsyncops.com

Contractual Clarity & Site Responsibility

Services are provided as owner's representation and construction operations consulting. The General Contractor remains the contracting party of record and retains all means, methods, and site-safety responsibility. No long-term contract — 30 days’ notice.

Book Free Scope Review
BS
BuildSync Assistant Online

Trained on the service flyer

Hi! I'm the BuildSync Ops assistant, trained on Katelyn Bethmann's service flyer. Ask me anything about pricing, services, onboarding, or how project operations liaison works — I'll answer straight from the source.

Answers sourced from the BuildSync Ops flyer. For binding terms, contact Katelyn directly.